Triple

T27939856
Position Surface form Disambiguated ID Type / Status
Subject Guntur railway division E700710 entity
Predicate hasNeighbouringRailwayDivision P168028 FINISHED
Object Vijayawada railway division NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vijayawada railway division | Statement: [Guntur railway division, hasNeighbouringRailwayDivision, Vijayawada railway division]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasNeighbouringRailwayDivision
Context triple: [Guntur railway division, hasNeighbouringRailwayDivision, Vijayawada railway division]
  • A. hasNeighbouringDivision chosen
    Indicates that one division is directly adjacent to and shares a boundary with another division.
  • B. railwayDivision
    Indicates that one administrative railway division is responsible for, manages, or encompasses another railway unit, line, or area within a rail network.
  • C. hasBorderRailwayStationWith
    Indicates that two regions share a common border at which there is a railway station connecting or serving both sides.
  • D. railwayDivisionHeadquartersOf
    Indicates that one location serves as the administrative headquarters for a specified railway division.
  • E. hasBorderRailConnectionWith
    Indicates that two places are directly connected to each other by a cross-border railway line or service.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a5028108190a14696d9821dde49 completed April 27, 2026, 1:53 p.m.
NER Named-entity recognition batch_69fd485f57dc8190820365396d041991 completed May 8, 2026, 2:20 a.m.
PD Predicate disambiguation batch_69fd47d35da081908bec8901018d186c completed May 8, 2026, 2:17 a.m.
Created at: April 27, 2026, 7:17 p.m.