Triple
T27929443
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Altair lunar lander |
E707937
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | crewed spacecraft design |
C2826
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: crewed spacecraft design Context triple: [Altair lunar lander, instanceOf, crewed spacecraft design]
-
A.
modular spacecraft
A modular spacecraft is a reconfigurable space vehicle composed of interchangeable, standardized modules that can be assembled, upgraded, or replaced to support different missions and functions.
-
B.
spacecraft
chosen
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
C.
space transportation system
A space transportation system is an integrated set of vehicles, infrastructure, and operations designed to move payloads and passengers between Earth and space or between locations in space.
-
D.
spacecraft engineering complex
A spacecraft engineering complex is a specialized facility where spacecraft and their subsystems are designed, assembled, integrated, tested, and prepared for launch and mission operations.
-
E.
uncrewed spaceflight
Uncrewed spaceflight is the operation of spacecraft without human passengers onboard, using automated systems and remote control to conduct missions such as exploration, observation, and technology testing in space.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96bbf2c48190a9d0e0291457aab6 |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 7:02 p.m.