Triple

T2792931
Position Surface form Disambiguated ID Type / Status
Subject GNU Guile E61969 entity
Predicate instanceOf P0 FINISHED
Object extension language platform C10734 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: extension language platform
Context triple: [GNU Guile, instanceOf, extension language platform]
  • A. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • B. .NET development platform component
    A .NET development platform component is a modular building block—such as a library, runtime, or tooling element—that integrates into the .NET ecosystem to provide specific functionality for building, running, or managing .NET applications.
  • C. polyglot
    A polyglot is a person who can understand and communicate in multiple languages with varying degrees of fluency.
  • D. Windows app platform
    A Windows app platform is a comprehensive framework and runtime environment that provides the tools, APIs, and services needed to build, deploy, and run applications on Windows devices.
  • E. programming language
    A programming language is a formal system of syntax and semantics that allows humans to write instructions a computer can execute to perform specific tasks or solve problems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7f51d881908768300ebd2fbdae completed March 6, 2026, 9:47 p.m.
Created at: March 6, 2026, 9:58 p.m.