Triple
T2792364
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GNU Make |
E61958
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | build automation tool |
C9696
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: build automation tool Context triple: [GNU Make, instanceOf, build automation tool]
-
A.
software build and distribution system
A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
-
B.
builder
A builder is an entity responsible for constructing or assembling complex objects or structures step-by-step, often following a specified plan or design.
-
C.
task automation framework
chosen
A task automation framework is a structured system of tools, components, and conventions that defines, schedules, and executes repetitive or complex tasks automatically based on configurable rules and workflows.
-
D.
library building program
A library building program is an organized initiative that plans, funds, designs, and constructs or renovates library facilities to meet community information, learning, and cultural needs.
-
E.
prototyping tool
A prototyping tool is a software application or platform that enables users to quickly create, visualize, and test interactive mockups or early versions of products, interfaces, or systems before full-scale development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7f51d881908768300ebd2fbdae |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:58 p.m.