Triple
T27855581
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | IEEE network diagram conventions |
E704075
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical notation |
C24403
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical notation Context triple: [IEEE network diagram conventions, instanceOf, technical notation]
-
A.
technical text
A technical text is a written document that explains, instructs, or reports on specialized subjects using precise, domain-specific language intended for readers with some level of technical knowledge.
-
B.
technical unit
A technical unit is a standardized measure or component used within a specific technical or engineering context to quantify, compare, or structure system elements.
-
C.
technical code
Technical code is a structured set of machine-readable instructions, written in a specific programming language, that implements precise computational logic and system behavior according to defined technical requirements.
-
D.
Technical specification
A technical specification is a detailed, formal document that precisely defines the functional, performance, and interface requirements of a system, component, or product to guide its design, implementation, and verification.
-
E.
notation system
chosen
A notation system is a structured set of symbols and rules used to represent information, concepts, or processes in a concise and standardized way.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840e614c8190a88cf9638c14a265 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 6:14 p.m.