Triple

T27855580
Position Surface form Disambiguated ID Type / Status
Subject IEEE network diagram conventions E704075 entity
Predicate instanceOf P0 FINISHED
Object diagramming standard C4263 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: diagramming standard
Context triple: [IEEE network diagram conventions, instanceOf, diagramming standard]
  • A. logical diagram
    A logical diagram is a visual representation that illustrates the relationships, structure, and flow of logic among concepts, conditions, or propositions within a system or argument.
  • B. diagram feature
    A diagram feature is a distinct visual or structural element within a diagram (such as shapes, connectors, labels, or annotations) that conveys specific information or supports the diagram’s overall meaning and functionality.
  • C. link diagram
    A link diagram is a planar projection of one or more intertwined loops (links) in three-dimensional space, with crossing information indicated to represent their topological structure.
  • D. standard chosen
    A standard is an established norm, rule, or benchmark used to measure, compare, or guide quality, performance, or behavior within a particular context.
  • E. standardization scheme
    A standardization scheme is a structured framework of rules, formats, and procedures designed to ensure consistency, compatibility, and interoperability across systems, processes, or data.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840e614c8190a88cf9638c14a265 completed April 27, 2026, 3:43 p.m.
Created at: April 27, 2026, 6:14 p.m.