Triple
T27846226
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Turów Power Station |
E703828
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | lignite-fired power station |
C10893
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: lignite-fired power station Context triple: [Turów Power Station, instanceOf, lignite-fired power station]
-
A.
coal-fired power station
chosen
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
B.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
D.
nuclear power facility
A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
-
E.
former cable car power station
A former cable car power station is a decommissioned facility that once generated and transmitted mechanical or electrical power to operate a city’s cable car system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840d9e3c819093615ebff4ec22be |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 6:07 p.m.