Triple

T27833823
Position Surface form Disambiguated ID Type / Status
Subject nova-novncproxy E703173 entity
Predicate instanceOf P0 FINISHED
Object OpenStack Nova service C6083 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: OpenStack Nova service
Context triple: [nova-novncproxy, instanceOf, OpenStack Nova service]
  • A. OpenStack project
    An OpenStack project is a logical container that groups and isolates cloud resources, users, and quotas within an OpenStack deployment for organizational and access control purposes.
  • B. cloud resource container
    A cloud resource container is a logical grouping construct that organizes, manages, and applies common policies (such as access control, billing, and configuration) to a collection of related cloud resources.
  • C. bare metal provisioning service
    A bare metal provisioning service automates the deployment, configuration, and lifecycle management of operating systems and software directly onto physical servers without a virtualization layer.
  • D. cloud service chosen
    A cloud service is an on-demand, internet-delivered computing resource—such as storage, processing power, or applications—managed by a provider and accessed remotely by users.
  • E. virtualization API
    A virtualization API is an interface that allows software to programmatically create, manage, and interact with virtualized computing resources such as virtual machines, networks, and storage.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840b94b08190950a4f77296938b2 completed April 27, 2026, 3:43 p.m.
Created at: April 27, 2026, 5:58 p.m.