Triple
T27833823
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | nova-novncproxy |
E703173
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | OpenStack Nova service |
C6083
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: OpenStack Nova service Context triple: [nova-novncproxy, instanceOf, OpenStack Nova service]
-
A.
OpenStack project
An OpenStack project is a logical container that groups and isolates cloud resources, users, and quotas within an OpenStack deployment for organizational and access control purposes.
-
B.
cloud resource container
A cloud resource container is a logical grouping construct that organizes, manages, and applies common policies (such as access control, billing, and configuration) to a collection of related cloud resources.
-
C.
bare metal provisioning service
A bare metal provisioning service automates the deployment, configuration, and lifecycle management of operating systems and software directly onto physical servers without a virtualization layer.
-
D.
cloud service
chosen
A cloud service is an on-demand, internet-delivered computing resource—such as storage, processing power, or applications—managed by a provider and accessed remotely by users.
-
E.
virtualization API
A virtualization API is an interface that allows software to programmatically create, manage, and interact with virtualized computing resources such as virtual machines, networks, and storage.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840b94b08190950a4f77296938b2 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:58 p.m.