Triple

T27825620
Position Surface form Disambiguated ID Type / Status
Subject Oregon Transportation Plan E702945 entity
Predicate instanceOf P0 FINISHED
Object multimodal transportation plan C10251 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multimodal transportation plan
Context triple: [Oregon Transportation Plan, instanceOf, multimodal transportation plan]
  • A. public transit plan
    A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
  • B. regional transport plan chosen
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • C. multimodal transport platform
    A multimodal transport platform is an integrated system that coordinates and optimizes the planning, booking, and management of journeys across multiple transportation modes (such as rail, road, air, and sea) through a unified digital interface.
  • D. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • E. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840ad1e88190b5bff2d1ddec8700 completed April 27, 2026, 3:43 p.m.
Created at: April 27, 2026, 5:51 p.m.