Triple

T27825618
Position Surface form Disambiguated ID Type / Status
Subject Oregon Transportation Plan E702945 entity
Predicate instanceOf P0 FINISHED
Object statewide transportation policy plan C19343 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: statewide transportation policy plan
Context triple: [Oregon Transportation Plan, instanceOf, statewide transportation policy plan]
  • A. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • B. short-range transportation plan
    A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
  • C. transport policy framework chosen
    A transport policy framework is a structured set of principles, goals, and regulatory tools that guide the planning, funding, operation, and governance of transportation systems to achieve economic, social, and environmental objectives.
  • D. public transit plan
    A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
  • E. road transport contingency plan
    A road transport contingency plan is a predefined set of strategies and procedures designed to maintain or quickly restore road-based logistics and mobility during disruptions, emergencies, or unexpected events.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef840ad1e88190b5bff2d1ddec8700 completed April 27, 2026, 3:43 p.m.
Created at: April 27, 2026, 5:51 p.m.