Triple
T27825309
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISO/IEC JTC 1/SC 22/WG 21 |
E702936
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | C++ standardization committee |
C18859
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: C++ standardization committee Context triple: [ISO/IEC JTC 1/SC 22/WG 21, instanceOf, C++ standardization committee]
-
A.
ISO/IEC subcommittee
chosen
An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
-
B.
Unicode Consortium committee
A Unicode Consortium committee is a formal working group of experts responsible for developing, reviewing, and standardizing aspects of the Unicode character encoding system and related text technologies.
-
C.
standards development meeting
A standards development meeting is a structured gathering of stakeholders who collaboratively discuss, draft, and refine technical or procedural standards to achieve consensus and formal approval.
-
D.
SAE International committee
A SAE International committee is a specialized group of experts organized under SAE International to develop, review, and maintain technical standards and guidelines for mobility engineering and related industries.
-
E.
standards development process
The standards development process is a structured, collaborative sequence of activities through which stakeholders propose, draft, review, and formally approve consensus-based technical or procedural standards.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840ad1e88190b5bff2d1ddec8700 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:51 p.m.