Triple
T27822651
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 稲荷神社 |
E702864
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 稲荷信仰の聖地 |
C53404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 稲荷信仰の聖地 Context triple: [稲荷神社, instanceOf, 稲荷信仰の聖地]
-
A.
Shugendō sacred site
A Shugendō sacred site is a mountainous religious landscape—often including temples, pilgrimage routes, and natural features—used for ascetic practices that blend Shinto, Buddhism, and indigenous mountain worship.
-
B.
Tenman-gū shrine
A Tenman-gū shrine is a Shinto shrine dedicated to Sugawara no Michizane, revered as Tenjin, the kami of scholarship, learning, and the arts.
-
C.
Shugendō temple
A Shugendō temple is a sacred mountain-based religious site in Japan where practitioners blend esoteric Buddhism, Shinto, and ascetic practices to pursue spiritual power and enlightenment through rigorous training in nature.
-
D.
Shugendō center
A Shugendō center is a religious site or institution where practitioners of the Japanese mountain ascetic tradition Shugendō gather for training, rituals, and spiritual practice.
-
E.
Shikoku Pilgrimage temple
A Shikoku Pilgrimage temple is one of the 88 sacred Buddhist sites on Japan’s Shikoku Island that collectively form a historic pilgrimage route associated with the monk Kūkai (Kōbō Daishi).
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840ad1e88190b5bff2d1ddec8700 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:49 p.m.