Triple
T27819094
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Open Services for Lifecycle Collaboration |
E702761
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | integration specification |
C23037
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: integration specification Context triple: [Open Services for Lifecycle Collaboration, instanceOf, integration specification]
-
A.
integration approach
An integration approach is a conceptual strategy that defines how separate systems, components, or processes are connected and coordinated to function together as a unified whole.
-
B.
integration component
An integration component is a modular software element that connects and coordinates interactions between disparate systems, services, or applications to enable seamless data and process flow.
-
C.
internal connector specification
An internal connector specification defines the technical, mechanical, and electrical requirements for how components within a system physically and logically interconnect.
-
D.
integration roadmap
An integration roadmap is a strategic plan that outlines the sequence, timeline, and dependencies for connecting systems, data, and processes to achieve cohesive end-to-end interoperability.
-
E.
specification
chosen
A specification is a detailed, precise description of requirements, behaviors, and constraints that a system, component, or process must satisfy.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840ad1e88190b5bff2d1ddec8700 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:47 p.m.