Triple
T27813792
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North American loading gauge |
E702603
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rail transport standard |
C17465
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rail transport standard Context triple: [North American loading gauge, instanceOf, rail transport standard]
-
A.
railway technical standard
chosen
A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
-
B.
United States railroad standard
United States railroad standard: A conceptual class representing the set of technical, operational, and safety specifications that govern the design, construction, and operation of railroads within the United States.
-
C.
transportation standard
A transportation standard is an agreed-upon set of rules, specifications, and protocols that ensure compatibility, safety, and efficiency across transportation systems, vehicles, and infrastructure.
-
D.
railway locomotive standardization scheme
A railway locomotive standardization scheme is a systematic framework for defining, organizing, and unifying the design, classification, and specifications of locomotives across a rail network to ensure compatibility, efficiency, and ease of maintenance.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef840a16748190926719ab96120bae |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:44 p.m.