Triple

T2780390
Position Surface form Disambiguated ID Type / Status
Subject Edmonston Pumping Plant E61677 entity
Predicate instanceOf P0 FINISHED
Object infrastructure facility C10698 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure facility
Context triple: [Edmonston Pumping Plant, instanceOf, infrastructure facility]
  • A. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • B. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • D. public service facility
    A public service facility is a place or infrastructure provided by government or community organizations to deliver essential services such as health, safety, education, or administration to the public.
  • E. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7e43c48190997b8fc8fb1663ab completed March 6, 2026, 9:47 p.m.
Created at: March 6, 2026, 9:57 p.m.