Triple
T27800130
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Highway 16A (various segments) |
E702216
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | auxiliary highway |
C50341
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: auxiliary highway Context triple: [Highway 16A (various segments), instanceOf, auxiliary highway]
-
A.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
-
B.
highway
A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
-
C.
motorway
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
D.
highway connection
chosen
A highway connection is a road segment or interchange that links two or more highways or major roads, enabling continuous vehicular travel between them.
-
E.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef8408e0588190977cffa32dc33a29 |
completed | April 27, 2026, 3:43 p.m. |
Created at: April 27, 2026, 5:33 p.m.