Triple

T27798912
Position Surface form Disambiguated ID Type / Status
Subject ApplicationMaster E702186 entity
Predicate lifecycleEndsWhen P94367 FINISHED
Object application finishes or fails LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: application finishes or fails | Statement: [ApplicationMaster, lifecycleEndsWhen, application finishes or fails]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: lifecycleEndsWhen
Context triple: [ApplicationMaster, lifecycleEndsWhen, application finishes or fails]
  • A. lifecycleEnd
    Indicates that an entity has reached the conclusion of its existence, validity, or operational period.
  • B. lifecycleStartsWhen
    Indicates that the lifecycle of one entity begins at the time or event defined by another entity.
  • C. lifecycleTiedTo chosen
    Indicates that the existence, duration, or validity of one entity is dependent on and ends with the lifecycle of another entity.
  • D. terminatesOn
    Indicates that one process, event, or state causes or marks the ending of another at a specific time or condition.
  • E. lifecycleType
    Indicates the specific stage or pattern within an entity’s overall lifecycle that characterizes how it begins, evolves, and ends.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef8408e0588190977cffa32dc33a29 completed April 27, 2026, 3:43 p.m.
NER Named-entity recognition batch_69f64dbbaefc8190952b8320bf4397d8 completed May 2, 2026, 7:17 p.m.
PD Predicate disambiguation batch_69f64cacd2c08190aed8a1761d0da679 completed May 2, 2026, 7:12 p.m.
Created at: April 27, 2026, 5:33 p.m.