Triple

T27790555
Position Surface form Disambiguated ID Type / Status
Subject AS-201 E701067 entity
Predicate instanceOf P0 FINISHED
Object Apollo test flight C22461 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Apollo test flight
Context triple: [AS-201, instanceOf, Apollo test flight]
  • A. orbital test flight
    An orbital test flight is an initial or experimental space mission conducted to evaluate a spacecraft’s performance, systems, and safety while achieving and operating in Earth orbit.
  • B. lunar landing mission
    A lunar landing mission is a coordinated spaceflight operation designed to transport a spacecraft from Earth to the Moon, achieve a controlled descent and landing on the lunar surface, conduct scientific or exploratory activities, and safely return data and/or crew.
  • C. suborbital test flight chosen
    A suborbital test flight is a non-orbit-reaching experimental space mission used to validate vehicles, systems, or technologies by briefly sending them into space and returning them to Earth.
  • D. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • E. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a50d8088190acbf3dfbb06d8091 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 5:27 p.m.