Triple

T27774304
Position Surface form Disambiguated ID Type / Status
Subject Chronicles of Huayang E699142 entity
Predicate instanceOf P0 FINISHED
Object Chinese historical work C13788 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chinese historical work
Context triple: [Chronicles of Huayang, instanceOf, Chinese historical work]
  • A. Chinese historical novel
    A Chinese historical novel is a long-form narrative that dramatizes events, figures, and social conditions from China’s past, blending historical fact with literary imagination to explore cultural, political, and moral themes.
  • B. historiographical work chosen
    A historiographical work is a scholarly study that analyzes how historical events, periods, or themes have been interpreted, debated, and written about by historians over time.
  • C. ancient Chinese political treatise
    An ancient Chinese political treatise is a classical written work that systematically expounds theories, principles, and strategies for governing the state, managing officials, and maintaining social order within the historical context of imperial China.
  • D. Chinese historical event
    A Chinese historical event is a significant occurrence in China’s past—such as a war, reform, revolution, treaty, or cultural milestone—that shaped the political, social, economic, or cultural development of Chinese civilization.
  • E. section of historical work
    A section of historical work is a distinct, thematically organized subdivision of a larger historical text that presents and analyzes specific events, periods, or topics within the broader narrative.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4b5a9081909c9111396c2be3d2 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 5:04 p.m.