Triple

T27755218
Position Surface form Disambiguated ID Type / Status
Subject SysV message queues E701317 entity
Predicate instanceOf P0 FINISHED
Object System V IPC facility C53288 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: System V IPC facility
Context triple: [SysV message queues, instanceOf, System V IPC facility]
  • A. Oberon-family operating system
    An Oberon-family operating system is a minimalist, modular, and tightly integrated system built around the Oberon programming language, combining the OS, runtime, and user interface into a cohesive, extensible environment.
  • B. POSIX-compliant operating system
    A POSIX-compliant operating system is one that adheres to the Portable Operating System Interface (POSIX) standards, ensuring consistent APIs and behavior for process control, file systems, and other core services across compliant Unix-like systems.
  • C. operating system fork
    An operating system fork is a process-creation mechanism that duplicates an existing process, producing a child process with a separate execution context that initially shares the parent's code and resources.
  • D. time-sharing system
    A time-sharing system is an operating system that allows multiple users or processes to share computing resources concurrently by rapidly switching the CPU among them, giving the illusion of simultaneous execution.
  • E. monolithic kernel
    A monolithic kernel is an operating system architecture where all core services (such as device drivers, file system management, and memory management) run in a single, shared address space in kernel mode.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a5193808190816eb7d0020b2d87 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 4:23 p.m.