Triple

T27755171
Position Surface form Disambiguated ID Type / Status
Subject SysV semaphores E701316 entity
Predicate instanceOf P0 FINISHED
Object UNIX System V IPC primitive C53287 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: UNIX System V IPC primitive
Context triple: [SysV semaphores, instanceOf, UNIX System V IPC primitive]
  • A. Oberon-family operating system
    An Oberon-family operating system is a minimalist, modular, and tightly integrated system built around the Oberon programming language, combining the OS, runtime, and user interface into a cohesive, extensible environment.
  • B. PDP-11 operating system
    A PDP-11 operating system is system software designed to manage hardware resources, provide program execution, and offer user and application services on Digital Equipment Corporation’s PDP-11 minicomputers.
  • C. operating system fork
    An operating system fork is a process-creation mechanism that duplicates an existing process, producing a child process with a separate execution context that initially shares the parent's code and resources.
  • D. time-sharing system
    A time-sharing system is an operating system that allows multiple users or processes to share computing resources concurrently by rapidly switching the CPU among them, giving the illusion of simultaneous execution.
  • E. Unix file system
    A Unix file system is a hierarchical, tree-structured organization of files and directories that manages how data is stored, named, accessed, and protected on Unix-based operating systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a5193808190816eb7d0020b2d87 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 4:23 p.m.