Triple
T27735899
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SynchronizationLockException |
E697527
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | exception class |
C53248
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: exception class Context triple: [SynchronizationLockException, instanceOf, exception class]
-
A.
abstract class
An abstract class is a class that cannot be instantiated on its own and is designed to be subclassed, often containing abstract methods that must be implemented by its concrete subclasses.
-
B.
category of error
A category of error is a conceptual grouping of related mistakes or failures that share common characteristics, causes, or effects, used to organize and analyze error types systematically.
-
C.
proper class
A proper class is a collection of mathematical objects too large to be a set, such as the class of all sets or all ordinals, and therefore cannot be an element of any other collection.
-
D.
subclass
A subclass is a conceptual class that inherits attributes and behaviors from a more general superclass while potentially adding or specializing its own unique features.
-
E.
errorNote
An errorNote records detailed information about an error occurrence, including its context, cause, and any relevant messages or metadata to support diagnosis and resolution.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590c3e288190ad54d2465af8ca4e |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 3:12 p.m.