Triple

T27732590
Position Surface form Disambiguated ID Type / Status
Subject Gluon GUI E697465 entity
Predicate instanceOf P0 FINISHED
Object version control client C32052 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: version control client
Context triple: [Gluon GUI, instanceOf, version control client]
  • A. Git interface chosen
    A Git interface is a tool or abstraction layer that allows users to interact with Git repositories—performing operations like committing, branching, merging, and syncing—through a more accessible command-line, graphical, or programmatic environment.
  • B. Git repository hosting service
    A Git repository hosting service is an online platform that stores, manages, and facilitates collaboration on Git-based source code repositories, providing features like version control, access control, issue tracking, and integration with development tools.
  • C. file synchronization utility
    A file synchronization utility is a tool that automatically compares and updates files between two or more locations to ensure they remain consistent and up to date.
  • D. command-line interface
    A command-line interface is a text-based user interface that allows users to interact with a computer system by typing commands and receiving textual output.
  • E. client
    A client is an entity (person, organization, or system) that requests, consumes, or relies on services or resources provided by another entity, often under an agreed-upon relationship or contract.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590c3e288190ad54d2465af8ca4e completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 3:12 p.m.