Triple

T27704826
Position Surface form Disambiguated ID Type / Status
Subject Bassi Hydroelectric Project E698525 entity
Predicate countryElectricitySystem P118435 FINISHED
Object Indian power system LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Indian power system | Statement: [Bassi Hydroelectric Project, countryElectricitySystem, Indian power system]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: countryElectricitySystem
Context triple: [Bassi Hydroelectric Project, countryElectricitySystem, Indian power system]
  • A. typeOfElectricity
    Indicates that one entity specifies the particular kind or category of electricity associated with another entity.
  • B. countryUsesElectricityFrom chosen
    Indicates that a country obtains and utilizes electrical power supplied from a specified source or provider.
  • C. countryUsesPower
    Indicates that a country employs or exercises a particular form of power (such as political, economic, or military) in some context or toward some target.
  • D. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • E. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590f655c81909f93893b3b3219b2 completed April 27, 2026, 12:39 p.m.
NER Named-entity recognition batch_69fd864235b481908738dbb69556bc62 completed May 8, 2026, 6:44 a.m.
PD Predicate disambiguation batch_69fd8373b6bc819091c554f29ee17fec completed May 8, 2026, 6:32 a.m.
Created at: April 27, 2026, 2:59 p.m.