Triple

T27687164
Position Surface form Disambiguated ID Type / Status
Subject Porsche Tiger E698062 entity
Predicate instanceOf P0 FINISHED
Object experimental heavy tank prototype C26065 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental heavy tank prototype
Context triple: [Porsche Tiger, instanceOf, experimental heavy tank prototype]
  • A. military prototype vehicle
    A military prototype vehicle is an experimental, often pre-production combat or support platform designed to test new technologies, capabilities, and configurations before potential adoption into active service.
  • B. prototype tank chosen
    A prototype tank is an experimental armored combat vehicle built to test and refine new technologies, designs, and capabilities before mass production and frontline deployment.
  • C. tank designer
    A tank designer is a specialist who conceptualizes, engineers, and optimizes armored combat vehicles to meet specific performance, protection, and battlefield requirements.
  • D. main battle tank
    A main battle tank is a heavily armored, highly mobile, front-line combat vehicle that combines powerful direct-fire weaponry with advanced protection and maneuverability to dominate ground engagements.
  • E. armored vehicle development program
    A coordinated, multi-phase initiative that manages the research, design, testing, production, and fielding of new or upgraded armored combat vehicles to meet defined military requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590df8708190af5488f0638e790c completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:50 p.m.