Triple
T27676197
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Grand |
E697784
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | improvised film |
C18731
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: improvised film Context triple: [The Grand, instanceOf, improvised film]
-
A.
experimental short film
An experimental short film is a brief, non-traditional motion picture that explores innovative techniques, structures, or aesthetics to challenge conventional storytelling and cinematic norms.
-
B.
grindhouse-style film
A grindhouse-style film is a low-budget, sensationalist movie that emphasizes graphic violence, exploitation themes, and retro aesthetics reminiscent of mid-20th-century grindhouse theaters.
-
C.
unproduced film
An unproduced film is a motion picture project that has been conceived and possibly developed through scripts or planning but has never progressed to full-scale production or release.
-
D.
mumblecore film
chosen
A mumblecore film is a low-budget, dialogue-driven movie that emphasizes naturalistic acting, improvised conversations, and the everyday emotional lives of young adults over conventional plot and polished production values.
-
E.
unreleased film
An unreleased film is a completed or partially completed motion picture that has not yet been publicly distributed, screened, or made available to audiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590d458c81909583290c3cd0478b |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:44 p.m.