Triple
T27675329
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Askey scheme of hypergeometric orthogonal polynomials |
E697762
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hierarchical scheme |
C53149
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hierarchical scheme Context triple: [Askey scheme of hypergeometric orthogonal polynomials, instanceOf, hierarchical scheme]
-
A.
partition scheme
A partition scheme is a strategy or method for dividing a dataset, resource, or problem space into distinct, non-overlapping parts to improve organization, performance, or manageability.
-
B.
standardization scheme
A standardization scheme is a structured framework of rules, formats, and procedures designed to ensure consistency, compatibility, and interoperability across systems, processes, or data.
-
C.
cumulative hierarchy
The cumulative hierarchy is a conceptual model of the set-theoretic universe built in transfinite stages, where each level consists of all sets that can be formed from the sets at earlier levels.
-
D.
hierarchical competition structure
A hierarchical competition structure is an organized system in which competitors are arranged in ranked levels or tiers, with advancement or status determined by performance against others within and across these levels.
-
E.
encoding scheme
An encoding scheme is a systematic method for converting information from one representation or format into another, typically to enable storage, transmission, or processing by specific systems.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590d458c81909583290c3cd0478b |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:43 p.m.