Triple

T27664268
Position Surface form Disambiguated ID Type / Status
Subject Android Things E697191 entity
Predicate consoleStatus P162928 FINISHED
Object shut down LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: shut down | Statement: [Android Things, consoleStatus, shut down]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: consoleStatus
Context triple: [Android Things, consoleStatus, shut down]
  • A. exportStatus
    Indicates the current state or outcome of an entity’s export process (e.g., pending, in progress, completed, or failed).
  • B. classStatus
    Indicates the current academic or enrollment standing of an entity within a class or course context.
  • C. operatorStatus
    Indicates the current operational state or condition of an operator (e.g., active, inactive, or in error).
  • D. controlStatus
    Indicates that one entity has a particular level, state, or condition of control over another entity or process.
  • E. printStatus
    Indicates the current state or outcome of a printing process or print job.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590b85a4819083ec7c12bd3c9c10 completed April 27, 2026, 12:39 p.m.
NER Named-entity recognition batch_69f634a28ab081908e57cd7e6a15703a completed May 2, 2026, 5:30 p.m.
PD Predicate disambiguation batch_69f62c1a92648190835a2c5250d8c758 completed May 2, 2026, 4:53 p.m.
PDg Predicate description generation batch_69f6305219f08190b55f6193a4a49984 completed May 2, 2026, 5:11 p.m.
Created at: April 27, 2026, 2:37 p.m.