Triple
T27660335
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lime |
E697104
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bike sharing company |
C46132
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bike sharing company Context triple: [Lime, instanceOf, bike sharing company]
-
A.
mobility services provider
chosen
A mobility services provider is an organization that offers and manages transportation solutions—such as ride-hailing, car-sharing, bike or scooter rentals, and integrated transit services—to enable people and goods to move efficiently from one place to another.
-
B.
ride system
A ride system is an integrated mechanical and control framework that transports guests or vehicles along a defined path or experience, coordinating motion, safety, and thematic elements.
-
C.
dock-based bike sharing scheme
A dock-based bike sharing scheme is a public transportation system where users borrow and return bicycles at fixed docking stations distributed across a city or region.
-
D.
transport technology company
A transport technology company develops and provides innovative digital solutions, platforms, and systems that optimize the planning, operation, and management of transportation services and infrastructure.
-
E.
micromobility device
A micromobility device is a small, lightweight, typically single-passenger vehicle—often electric-powered—designed for short-distance urban travel, such as e-scooters, e-bikes, and similar compact transport options.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590b85a4819083ec7c12bd3c9c10 |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:36 p.m.