Triple
T27658052
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISO/IEC JTC 1/SC 22/WG 14 |
E697045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IEC working group |
C49215
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IEC working group Context triple: [ISO/IEC JTC 1/SC 22/WG 14, instanceOf, IEC working group]
-
A.
ISO/IEC subcommittee
An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
-
B.
United States national committee of the IEC
The United States National Committee of the IEC is the U.S. body responsible for coordinating national participation in the International Electrotechnical Commission’s standardization activities and representing U.S. interests in global electrotechnical standards development.
-
C.
IEC standard
An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
-
D.
IETF working group
An IETF working group is a collaborative, time-bounded team of experts chartered within the Internet Engineering Task Force to develop, discuss, and standardize specific Internet technologies or protocols.
-
E.
international working group
chosen
An international working group is a collaborative body composed of experts and stakeholders from multiple countries who coordinate efforts to address shared issues, develop standards, or advance common goals across borders.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590b85a4819083ec7c12bd3c9c10 |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:35 p.m.