Triple

T27655297
Position Surface form Disambiguated ID Type / Status
Subject PMA-1 E696975 entity
Predicate instanceOf P0 FINISHED
Object Pressurized Mating Adapter C10437 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Pressurized Mating Adapter
Context triple: [PMA-1, instanceOf, Pressurized Mating Adapter]
  • A. spacecraft payload adapter
    A spacecraft payload adapter is a structural interface that securely connects a satellite or payload to the launch vehicle, ensuring proper alignment, load transfer, and separation during ascent and deployment.
  • B. spacecraft berthing mechanism chosen
    A spacecraft berthing mechanism is a structural and mechanical interface system that enables two spacecraft or modules to be precisely aligned, securely joined, and later separated while maintaining required load paths and connections for power, data, and environmental control.
  • C. Long Duration Propulsive EELV Secondary Payload Adapter mission
    A Long Duration Propulsive EELV Secondary Payload Adapter mission is a spaceflight that uses a propulsive ESPA ring on an Evolved Expendable Launch Vehicle to carry and operate secondary payloads for extended periods in space, providing independent maneuvering and mission flexibility separate from the primary payload.
  • D. spacecraft docking system
    A spacecraft docking system is a coordinated assembly of mechanical interfaces, sensors, and control software that enables two spacecraft to safely approach, align, and connect in orbit for transfer of crew, cargo, or resources.
  • E. International Space Station truss segment
    An International Space Station truss segment is a structural module that forms part of the station’s backbone, supporting solar arrays, radiators, and utilities while providing attachment points and routing for power, data, and thermal control systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590abd3c8190834d0193bde12007 completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:34 p.m.