Triple

T27636964
Position Surface form Disambiguated ID Type / Status
Subject Stubby E696495 entity
Predicate instanceOf P0 FINISHED
Object internal Google technology C42858 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: internal Google technology
Context triple: [Stubby, instanceOf, internal Google technology]
  • A. Google X project
    A Google X project is an experimental, high-risk, high-reward initiative within Alphabet’s research lab focused on developing breakthrough technologies that could have massive, long-term societal impact.
  • B. organizational unit at Google
    An organizational unit at Google is a logical grouping of users, devices, and resources within the company’s directory structure used to apply and manage specific policies, settings, and access controls.
  • C. Google hardware platform
    A Google hardware platform is an integrated ecosystem of Google-designed devices and underlying technologies (such as processors, operating systems, and cloud services) that work together to deliver optimized performance, seamless connectivity, and intelligent user experiences.
  • D. Google developer product chosen
    A Google developer product is a tool, platform, or service provided by Google that enables software developers to build, test, deploy, and optimize applications or integrations within the Google ecosystem or on the open web.
  • E. Google employee
    A Google employee is an individual hired by Google to contribute to the development, operation, or support of the company’s products, services, and internal functions within its organizational structure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5909f3848190805f35b76833e722 completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:24 p.m.