Triple
T27631474
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan C |
E696347
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | drilling strategy |
C53053
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: drilling strategy Context triple: [Plan C, instanceOf, drilling strategy]
-
A.
drill ground
A drill ground is an open, designated area where individuals or groups practice and rehearse structured exercises, maneuvers, or training routines, often for military or ceremonial purposes.
-
B.
deep borehole
A deep borehole is a narrow, vertically drilled shaft that extends several kilometers into the Earth's crust, typically used for scientific exploration, resource extraction, or long-term waste isolation.
-
C.
drill manufacturer
A drill manufacturer is a company that designs, produces, and distributes drilling tools and equipment for industrial, commercial, and consumer use.
-
D.
scientific drilling project
A scientific drilling project is a coordinated research effort that uses specialized drilling techniques to recover subsurface samples and data in order to investigate geological, environmental, or planetary processes.
-
E.
drill hall
A drill hall is a large, open indoor space designed for military or cadet training exercises, parades, and assemblies.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef59092c8881908114ad184248cc46 |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:21 p.m.