Triple

T27624802
Position Surface form Disambiguated ID Type / Status
Subject Glass Skywalk at Tianmen Mountain E696172 entity
Predicate instanceOf P0 FINISHED
Object glass walkway C3675 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glass walkway
Context triple: [Glass Skywalk at Tianmen Mountain, instanceOf, glass walkway]
  • A. elevated walkway chosen
    An elevated walkway is a raised pedestrian pathway, typically supported above ground level, that allows people to move safely and efficiently over obstacles, traffic, or uneven terrain.
  • B. covered walkway
    A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
  • C. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • D. wooden walkway
    A wooden walkway is an elevated or ground-level path constructed from timber planks, designed to provide a stable, durable walking surface over terrain such as sand, wetlands, or landscaped areas.
  • E. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef59092c8881908114ad184248cc46 completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:17 p.m.