Triple

T27615402
Position Surface form Disambiguated ID Type / Status
Subject ISO/IEC 15504 E700426 entity
Predicate instanceOf P0 FINISHED
Object software process assessment standard C36879 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software process assessment standard
Context triple: [ISO/IEC 15504, instanceOf, software process assessment standard]
  • A. software process improvement framework chosen
    A software process improvement framework is a structured approach that defines methods, practices, and metrics to systematically assess, refine, and optimize an organization’s software development and maintenance processes.
  • B. software review and audit standard
    A software review and audit standard is a formalized set of criteria, processes, and guidelines used to systematically evaluate software products and development practices for quality, compliance, security, and reliability.
  • C. standards development process
    The standards development process is a structured, collaborative sequence of activities through which stakeholders propose, draft, review, and formally approve consensus-based technical or procedural standards.
  • D. software development process document
    A software development process document is a formal artifact that defines, organizes, and communicates the standardized activities, roles, workflows, and guidelines used to plan, build, test, and maintain software within an organization.
  • E. standards development program
    A standards development program is an organized initiative that coordinates stakeholders to create, review, and maintain formal specifications and guidelines to ensure consistency, quality, and interoperability across products, services, or processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4f1d9c8190b0705acda054368d completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 2:12 p.m.