Triple

T2759177
Position Surface form Disambiguated ID Type / Status
Subject Folsom Dam E61177 entity
Predicate partOfSystem P840 FINISHED
Object American River watershed infrastructure
American River watershed infrastructure is the interconnected system of dams, levees, reservoirs, and related facilities that manage flood control, water supply, and ecosystem needs throughout California’s American River basin.
E296061 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: American River watershed infrastructure | Statement: [Folsom Dam, partOfSystem, American River watershed infrastructure]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: American River watershed infrastructure
Context triple: [Folsom Dam, partOfSystem, American River watershed infrastructure]
  • A. Sacramento River watershed infrastructure
    Sacramento River watershed infrastructure comprises the network of dams, reservoirs, levees, canals, and related facilities that manage water supply, flood control, and ecosystem conditions throughout the Sacramento River basin in Northern California.
  • B. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • C. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • D. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • E. San Joaquin River Conservancy
    The San Joaquin River Conservancy is a state agency dedicated to protecting, restoring, and providing public access to natural and recreational resources along the San Joaquin River in California.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: American River watershed infrastructure
Triple: [Folsom Dam, partOfSystem, American River watershed infrastructure]
Generated description
American River watershed infrastructure is the interconnected system of dams, levees, reservoirs, and related facilities that manage flood control, water supply, and ecosystem needs throughout California’s American River basin.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: American River watershed infrastructure
Target entity description: American River watershed infrastructure is the interconnected system of dams, levees, reservoirs, and related facilities that manage flood control, water supply, and ecosystem needs throughout California’s American River basin.
  • A. Sacramento River watershed infrastructure
    Sacramento River watershed infrastructure comprises the network of dams, reservoirs, levees, canals, and related facilities that manage water supply, flood control, and ecosystem conditions throughout the Sacramento River basin in Northern California.
  • B. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • C. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • D. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • E. San Joaquin River Conservancy
    The San Joaquin River Conservancy is a state agency dedicated to protecting, restoring, and providing public access to natural and recreational resources along the San Joaquin River in California.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7a85bc819094a349b84beb1f2c completed March 6, 2026, 9:47 p.m.
NER Named-entity recognition batch_69abdb8d34f88190a760111fe303cf24 completed March 7, 2026, 8:02 a.m.
NED1 Entity disambiguation (via context triple) batch_69afbbe2d9cc81909b041635ae793bc3 completed March 10, 2026, 6:36 a.m.
NEDg Description generation batch_69afbcc1dd988190826ab05e55adf1ee completed March 10, 2026, 6:40 a.m.
NED2 Entity disambiguation (via description) batch_69afbd452e1c8190a3ee9eaf642e80a0 completed March 10, 2026, 6:42 a.m.
Created at: March 6, 2026, 9:57 p.m.