Triple

T27591657
Position Surface form Disambiguated ID Type / Status
Subject Vitess E699799 entity
Predicate CNCFStatus P163347 FINISHED
Object graduated project LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: graduated project | Statement: [Vitess, CNCFStatus, graduated project]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: CNCFStatus
Context triple: [Vitess, CNCFStatus, graduated project]
  • A. isCNCFProject chosen
    Indicates that an entity is officially recognized or listed as a project under the Cloud Native Computing Foundation (CNCF).
  • B. harborStatus
    Indicates the current operational or accessibility condition of a harbor, such as whether it is open, restricted, or closed for use.
  • C. runtimeStatus
    Indicates the current operational state or condition of an entity while it is running or executing.
  • D. canonicalStatus
    Indicates the formal or official standing of an entity within an established authoritative or normative system.
  • E. foremanStatus
    Indicates the role or condition of an entity acting as a foreman in relation to a task, project, or group.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4d71f081909a1235763206b691 completed April 27, 2026, 1:53 p.m.
NER Named-entity recognition batch_69f63894e5848190aec428392562ab06 completed May 2, 2026, 5:47 p.m.
PD Predicate disambiguation batch_69f6370c8c7c8190a02ea82847bb6e76 completed May 2, 2026, 5:40 p.m.
Created at: April 27, 2026, 2:05 p.m.