Triple

T27585483
Position Surface form Disambiguated ID Type / Status
Subject J2EE Standard Tools E699680 entity
Predicate instanceOf P0 FINISHED
Object development tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: development tool
Context triple: [J2EE Standard Tools, instanceOf, development tool]
  • A. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • B. developer tools company
    A developer tools company creates and provides software products, platforms, or services that help software engineers build, test, deploy, and maintain applications more efficiently and reliably.
  • C. database development tool
    A database development tool is a software application that helps developers design, build, manage, and optimize databases through features like schema modeling, query editing, debugging, and performance analysis.
  • D. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • E. prototyping tool
    A prototyping tool is a software application or platform that enables users to quickly create, visualize, and test interactive mockups or early versions of products, interfaces, or systems before full-scale development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef6a4cb8b881909b3a8d630fd89df2 completed April 27, 2026, 1:53 p.m.
Created at: April 27, 2026, 2:04 p.m.