Triple
T2758326
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 8 Engineer Brigade |
E61159
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | British Army brigade |
C1740
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: British Army brigade Context triple: [8 Engineer Brigade, instanceOf, British Army brigade]
-
A.
British Army organizational element
chosen
A British Army organizational element is a defined structural unit—such as a section, platoon, company, battalion, brigade, or division—comprising personnel, equipment, and command relationships arranged to perform specific military roles within the Army’s hierarchy.
-
B.
British Army deployment
British Army deployment is the organized assignment and movement of British Army personnel and resources to specific locations or operations to fulfill military objectives and commitments.
-
C.
British Army position
A British Army position is a specific role or rank within the British Army’s organizational structure, defining an individual’s responsibilities, authority, and place in the military hierarchy.
-
D.
British Army facility
A British Army facility is a location owned, operated, or used by the British Army for purposes such as training, administration, logistics, accommodation, storage, or operational deployment.
-
E.
airborne infantry brigade
An airborne infantry brigade is a highly mobile, light infantry formation trained and equipped to deploy rapidly by air, including parachute or air assault operations, to seize and hold key objectives behind or ahead of enemy lines.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7a85bc819094a349b84beb1f2c |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:57 p.m.