Triple

T27572400
Position Surface form Disambiguated ID Type / Status
Subject L3Out E696069 entity
Predicate instanceOf P0 FINISHED
Object Cisco ACI construct C52937 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Cisco ACI construct
Context triple: [L3Out, instanceOf, Cisco ACI construct]
  • A. Cisco Nexus feature
    A Cisco Nexus feature is a configurable software capability or service on Cisco Nexus switches that can be individually enabled or disabled to provide specific networking functions such as virtualization, security, automation, or advanced Layer 2/Layer 3 services.
  • B. network slicing construct
    A network slicing construct is an abstract, configurable partition of a physical or virtual network that provides isolated, end-to-end resources and policies tailored to specific services or tenants.
  • C. network automation platform
    A network automation platform is a centralized system that orchestrates, configures, monitors, and manages network devices and services through automated workflows, policies, and integrations to improve efficiency, consistency, and reliability.
  • D. network configuration language
    A network configuration language is a specialized syntax and set of constructs used to define, manage, and automate the settings, policies, and behaviors of network devices and services.
  • E. Cisco initiative
    A Cisco initiative is a strategic program or project undertaken by Cisco to drive innovation, improve technologies or services, and advance specific business, social, or industry objectives.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef53891af88190a193c5e2a1dac9b1 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:43 p.m.