Triple

T27571536
Position Surface form Disambiguated ID Type / Status
Subject Type 100 monorail trains E696046 entity
Predicate instanceOf P0 FINISHED
Object rubber-tired automated people mover train C19545 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rubber-tired automated people mover train
Context triple: [Type 100 monorail trains, instanceOf, rubber-tired automated people mover train]
  • A. automated people mover vehicle
    An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
  • B. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • C. rubber-tired transit system chosen
    A rubber-tired transit system is a guided public transportation mode in which vehicles run on rubber tires along a dedicated roadway or track, often combining bus-like flexibility with rail-like guidance and capacity.
  • D. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • E. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef53891af88190a193c5e2a1dac9b1 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:43 p.m.