Triple

T27561303
Position Surface form Disambiguated ID Type / Status
Subject Background Intelligent Transfer Service E695773 entity
Predicate jobState P162705 FINISHED
Object ERROR LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ERROR | Statement: [Background Intelligent Transfer Service, jobState, ERROR]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: jobState
Context triple: [Background Intelligent Transfer Service, jobState, ERROR]
  • A. jobState chosen
    Indicates the current status or phase of progress that a job or task is in within its lifecycle.
  • B. stateOfEmployment
    Indicates that one entity’s employment status or condition is defined in relation to another entity (such as an employer, position, or employment situation).
  • C. careerStatus
    Indicates the current stage, position, or condition of an entity within its professional or occupational life.
  • D. ResumeStatus
    Indicates the current state or condition of a resume within a review or processing workflow.
  • E. applicantState
    Indicates the current status or condition assigned to an applicant within a process or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5387e97c8190a9dab040d21cd048 completed April 27, 2026, 12:16 p.m.
NER Named-entity recognition batch_69f643ed0b7481908cf25f3afec0a61d completed May 2, 2026, 6:35 p.m.
PD Predicate disambiguation batch_69f641dc8ff48190ab575d855616580c completed May 2, 2026, 6:26 p.m.
Created at: April 27, 2026, 1:39 p.m.