Triple

T27560284
Position Surface form Disambiguated ID Type / Status
Subject Pandoc E695751 entity
Predicate instanceOf P0 FINISHED
Object document converter C52923 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: document converter
Context triple: [Pandoc, instanceOf, document converter]
  • A. document viewer
    A document viewer is a software component or application that allows users to open, display, navigate, and sometimes minimally interact with digital documents in various formats without editing their content.
  • B. document preparation system
    A document preparation system is a software tool or suite that enables users to create, edit, format, and manage text-based documents, often integrating layout, styling, and output features for printing or digital distribution.
  • C. document digitization tool
    A document digitization tool is a software system that converts physical or analog documents into searchable, structured digital formats through processes like scanning, OCR, and metadata extraction.
  • D. acrobat
    An acrobat is a highly skilled performer who executes precise, physically demanding feats of balance, agility, and coordination, often in circus, stage, or aerial environments.
  • E. digital document workflow platform
    A digital document workflow platform is a system that enables users to create, manage, route, review, approve, and securely store documents electronically through automated, trackable processes.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5387e97c8190a9dab040d21cd048 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:38 p.m.