Triple

T27555829
Position Surface form Disambiguated ID Type / Status
Subject 광안대교 E695633 entity
Predicate instanceOf P0 FINISHED
Object 복층 교량 C3384 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 복층 교량
Context triple: [광안대교, instanceOf, 복층 교량]
  • A. twin-span bridge
    A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
  • B. double-decked bridge chosen
    A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
  • C. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • D. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • E. beam bridge
    A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5387e97c8190a9dab040d21cd048 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:37 p.m.