Triple

T27555828
Position Surface form Disambiguated ID Type / Status
Subject 광안대교 E695633 entity
Predicate instanceOf P0 FINISHED
Object 해상 교량 C4842 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 해상 교량
Context triple: [광안대교, instanceOf, 해상 교량]
  • A. cross-sea bridge chosen
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • B. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • C. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • D. разводной мост
    Разводной мост — это мостовая конструкция с подвижными пролетами, которые могут подниматься или раздвигаться для пропуска судов по водному пути.
  • E. dam bridge
    A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5387e97c8190a9dab040d21cd048 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:37 p.m.