Triple

T2754696
Position Surface form Disambiguated ID Type / Status
Subject Harvard Summer School E61071 entity
Predicate instanceOf P0 FINISHED
Object summer school C10928 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: summer school
Context triple: [Harvard Summer School, instanceOf, summer school]
  • A. secondary campus
    A secondary campus is a separate physical site or facility that extends the operations, services, or population of a primary institution, such as a school or college, while remaining administratively connected to it.
  • B. day school
    A day school is an educational institution where students attend classes during the day and return home afterward, without residing on campus.
  • C. secondary school
    A secondary school is an educational institution that provides formal learning for adolescents, typically between primary education and higher or vocational education, focusing on a broad curriculum to prepare students for further study or employment.
  • D. public school
    A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
  • E. mission school
    A mission school is an educational institution established and run by religious missionaries to provide formal schooling often combined with religious instruction and cultural or social outreach.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7a85bc819094a349b84beb1f2c completed March 6, 2026, 9:47 p.m.
Created at: March 6, 2026, 9:56 p.m.