Triple

T27518955
Position Surface form Disambiguated ID Type / Status
Subject Baskonia E694651 entity
Predicate hasReachedStage P128963 FINISHED
Object EuroLeague Final Four NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: EuroLeague Final Four | Statement: [Baskonia, hasReachedStage, EuroLeague Final Four]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasReachedStage
Context triple: [Baskonia, hasReachedStage, EuroLeague Final Four]
  • A. hasStageIn
    Indicates a relationship where one entity occurs, exists, or takes place within a particular stage or phase of another process, lifecycle, or sequence.
  • B. hasWonStageIn
    Indicates that an entity has achieved victory in at least one stage of a specified multi-stage event or competition.
  • C. hasReach
    Indicates that one entity is able to extend its influence, access, or physical span to another entity or area.
  • D. hasFinalStage
    Indicates that an entity possesses or reaches a concluding or ultimate phase in a process, sequence, or lifecycle.
  • E. stageReached chosen
    Indicates that a process, task, or entity has arrived at or completed a specific stage or phase within a defined progression.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef538550208190aa9de8e2cb260d93 completed April 27, 2026, 12:16 p.m.
NER Named-entity recognition batch_69fed357b2b4819084c709056a54461f completed May 9, 2026, 6:25 a.m.
PD Predicate disambiguation batch_69fed103d9cc81909b11619745110c61 completed May 9, 2026, 6:15 a.m.
Created at: April 27, 2026, 1:20 p.m.