Triple

T27514777
Position Surface form Disambiguated ID Type / Status
Subject York River waterfront E694514 entity
Predicate instanceOf P0 FINISHED
Object strategic shoreline C52866 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: strategic shoreline
Context triple: [York River waterfront, instanceOf, strategic shoreline]
  • A. public shoreline
    A public shoreline is a coastal area legally accessible to all people for recreation, passage, and enjoyment, typically protected by regulations that prevent exclusive private ownership or obstruction.
  • B. coastal defence
    Coastal defence is the set of structures, natural features, and management strategies designed to protect coastlines from erosion, flooding, and storm impacts.
  • C. coastal passage
    A coastal passage is a navigable route that follows along a shoreline, often using natural channels and sheltered waters between the coast and offshore features such as islands or reefs.
  • D. coastal engagement
    Coastal engagement is the dynamic interaction between people and coastal environments through social, economic, cultural, and ecological activities that shape and are shaped by shoreline spaces.
  • E. coastal reservation
    A coastal reservation is a protected shoreline area designated to conserve marine and coastal ecosystems while allowing limited, sustainable human use and cultural activities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef53842afc8190ba6bd4e4999bda67 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:18 p.m.