Triple

T27509010
Position Surface form Disambiguated ID Type / Status
Subject Vision 2020 policy E694358 entity
Predicate statusBy2020 P182391 FINISHED
Object partially achieved LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: partially achieved | Statement: [Vision 2020 policy, statusBy2020, partially achieved]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: statusBy2020
Context triple: [Vision 2020 policy, statusBy2020, partially achieved]
  • A. statusAfter2020
    Indicates the condition or state of an entity as it exists after the year 2020.
  • B. statusBefore2022
    Indicates that an entity’s status or condition is defined as it existed prior to the year 2022.
  • C. statusAfter2019
    Indicates the condition or state of an entity specifically in the period following the year 2019.
  • D. statusAfter2017
    Indicates the status or condition an entity has specifically after the year 2017.
  • E. post2020Status
    Indicates the status or condition of an entity specifically in the period after the year 2020.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef53842afc8190ba6bd4e4999bda67 completed April 27, 2026, 12:16 p.m.
NER Named-entity recognition batch_69f78d7211a48190bfb59c406f0bf12f completed May 3, 2026, 6:01 p.m.
PD Predicate disambiguation batch_69f78b8cb3a881909ebaac1b503988c2 completed May 3, 2026, 5:53 p.m.
PDg Predicate description generation batch_69f78c6014e08190864785a4fe3e8e73 completed May 3, 2026, 5:56 p.m.
Created at: April 27, 2026, 1:15 p.m.