Triple

T27502970
Position Surface form Disambiguated ID Type / Status
Subject Philippine Navy shore installations E694208 entity
Predicate instanceOf P0 FINISHED
Object naval shore installation network C18743 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval shore installation network
Context triple: [Philippine Navy shore installations, instanceOf, naval shore installation network]
  • A. naval shore establishment chosen
    A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
  • B. naval anchorage network
    A naval anchorage network is an interconnected system of designated maritime anchor points, supporting infrastructure, and communication links that enables coordinated deployment, resupply, and protection of naval vessels across strategic sea areas.
  • C. naval security force
    A naval security force is a specialized military unit responsible for protecting naval assets, personnel, and infrastructure from threats through law enforcement, anti-terrorism, and force protection operations at sea and in port.
  • D. naval administrative office
    A naval administrative office is an organizational unit responsible for managing the paperwork, personnel records, logistics, and regulatory compliance that support the operations of a navy or naval installation.
  • E. naval support services company
    A naval support services company provides specialized operational, logistical, maintenance, and technical services to naval and maritime organizations to ensure the readiness, safety, and efficiency of their fleets and related infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef538370888190b1ddf53bb4831188 completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:12 p.m.